2015-02-17 - 14719 - Break Fix - Pack timings for shipping point 0320 #ProductionBreakFix #MMPPSupport

2015-02-17 - 14719 - Break Fix - Pack timings for shipping point 0320

Problem Summary


Maintain packing timings for shipping point 0320 inline with 0116.

Admin Info


Purpose
Pack timings for shipping point 0320
Requested by
Jeff
Issue Date
02-17-2015
Resolved by
Laxman
Resolved Date
02-20-2015
Document Status
Complete

Detailed Problem Description

(Include Screen Shots if required )

Maintain packing timings for shipping point 0320 inline (same as) with 0116.

Solution Analysis and Recommendations

(Include Screen Shots if required)

As per the business requirement New Era advised to maintain the packing timings for shipping point 0320 inline (same as) with 0116 to run the DC capacity tool.

Pack times.jpg

Resolution


Maintained the packing timings for shipping 0320.